Reference projects: power and heating plants

POWER PLANT IN POLAND

Requirement: Two structurally identical CEDI systems for post-cleaning for turbine back-feeding
System model: USFVNX55-2 with a system output of 30.0 m3/h
Version: PVC-U piping and chemical disinfection
Realised: 2014

POWER PLANT IN POLAND

Requirement: Two structurally identical CEDI systems for post-cleaning for turbine back-feeding
System model: USFVNX50-3 with a system output of 50.0 m3/h
Version: PP piping and chemical disinfection
Realised: 2014

BIOMASS POWER PLANT IN ROMANIA

Requirement: Water treatment system for the production of purified water (through RO and CEDI with degassing) with upstream filtration and double softener unit for turbine back-feeding and storage tank and double pump station for distribution
System model: RO4000 Plus with a system output of 4.0 m3/h Second system section: pre-filtration and softener station with a system output of 100 m3/h
Version: PVC-U piping and chemical disinfection
Realised: 2013/2014

POWER PLANT IN POLAND

Requirement: Two structurally identical CEDI systems for post-cleaning for turbine back-feeding
System model USFVNX50-2 with a system output of 50.0 m3/h
Version: PVC-U piping and chemical disinfection
Realised: 2012

POWER PLANT IN POLAND

Requirement: Two CEDI systems for post-cleaning for turbine back-feeding incl

Lethality occurred at 1000 mg/kg and 500 mg/kg in rats and 1000 mg/kg in mice.• Re-assess cardiovascular status tadalafil generic.

alteration of sildenafil absorption rate with food, reduced sildenafil clearance with hepatic status, with increasing age and with CYP3A4 inhibitors (such as ketoconazole, erythromycin, cimetidine).• “How was your sexual functioning prior to this time?” tadalafil without prescription.

. upstream membrane degasser for CO2 removal

System model: USFLX45Z-1 and USFLX45Z-2 with a system output of 5.0 m³/h and 10 m³/h
Version: PVC-U piping and chemical disinfection
Realised: 2012