The system output is 1.5 m³/h; the system is a combination of softener, reverse osmosis and CEDI. The storage and distribution of the purified water is also part of the job. The ring main, which is around 300 m long, is orbital welded and installed.

Delivery and handover is planned for December 2015.

© 2018 USF Water Purification GmbH