Reference projects: power and heating plants

POWER PLANT IN POLAND

Requirement: Two structurally identical CEDI systems for post-cleaning for turbine back-feeding
System model: USFVNX55-2 with a system output of 30.0 m3/h
Version: PVC-U piping and chemical disinfection
Realised: 2014

POWER PLANT IN POLAND

Requirement: Two structurally identical CEDI systems for post-cleaning for turbine back-feeding
System model: USFVNX50-3 with a system output of 50.0 m3/h
Version: PP piping and chemical disinfection
Realised: 2014

BIOMASS POWER PLANT IN ROMANIA

Requirement: Water treatment system for the production of purified water (through RO and CEDI with degassing) with upstream filtration and double softener unit for turbine back-feeding and storage tank and double pump station for distribution
System model: RO4000 Plus with a system output of 4.0 m3/h Second system section: pre-filtration and softener station with a system output of 100 m3/h
Version: PVC-U piping and chemical disinfection
Realised: 2013/2014

POWER PLANT IN POLAND

Requirement: Two structurally identical CEDI systems for post-cleaning for turbine back-feeding
System model USFVNX50-2 with a system output of 50.0 m3/h
Version: PVC-U piping and chemical disinfection
Realised: 2012

POWER PLANT IN POLAND

Requirement: Two CEDI systems for post-cleaning for turbine back-feeding incl. upstream membrane degasser for CO2 removal
System model: USFLX45Z-1 and USFLX45Z-2 with a system output of 5.0 m³/h and 10 m³/h
Version: PVC-U piping and chemical disinfection
Realised: 2012